Waterfall – August Update

Work on the waterfall repair is scheduled to begin in mid-August. Rainy weather this summer has set contractor schedules way back, so we are hoping that our timeline can be maintained.  The work that needs to be done on our feature will require several days of dry weather to apply and cure the product being used to seal the cracks.

Please be cautious in the traffic circle area once works begins.